The construction steps of the square buried light are as follows:
1. Preparation for construction
Before construction, it is necessary to determine the installation location and number of buried lights according to the design requirements and actual situation of the square. At the same time, prepare the required materials, including buried lights, waterproof cables, junction boxes, shells, and related construction tools. Ensure that all materials are of reliable quality and comply with relevant standards and specifications.
2, excavation foundation pit
According to the size and shape of the buried lamp, excavate the appropriate size of the foundation pit at the determined installation position. The depth and width of the foundation pit should be slightly larger than the base of the floor lamp to facilitate the installation and fixing of the floor lamp. During excavation, pay attention to keep the foundation pit flat and vertical to avoid damaging the surrounding ground facilities.
3. Lay cables and install junction boxes
Laying waterproof cables in the foundation pit, the length of the cable should be determined according to the location of the ground lamp and the distance from the power supply. Cables should be kept at a certain distance from the ground to prevent water and damage. At the same time, install the junction box in the appropriate position for connecting the cable and the buried light. The junction box should be made of products with good waterproof performance to ensure the safety and reliability of the cable connection.
4, fixed ground light and debugging
The base of the buried lamp is placed in the foundation pit and fixed with concrete. During the fixing process, pay attention to adjusting the position of the base to keep it level with the ground. After the concrete has solidified, install the floor lamp on the base and connect the cable. After the connection is complete, turn on the power for debugging, and check whether the lighting effect and brightness of the ground lamp meet the requirements. At the same time, ensure that the Angle and direction of the floor lamp are adjusted to the best state to play the best lighting effect.
During the construction process, the following points should also be noted:
To ensure the safety of the construction process, especially when excavating the foundation pit and connecting the power supply, to strictly follow the safety operation procedures.
Keep the construction site clean and orderly, clean up the construction garbage and waste in time.
During the debugging process, if the floor lamp is found to have problems or faults, it should be handled and repaired in time to ensure that the floor lamp can work normally.
Through the above steps and precautions, the construction work of the square buried light can be successfully completed to provide high-quality lighting services for the square.